Roof Edge Protection at Foundry Courtyard, Glasgow for Student Accommodation
M8 Scaffolding was appointed to provide access towers, loading bays and roof edge protection at Foundry Courtyard, a student accommodation development at 214 Kennedy Street in Glasgow’s Townhead area.
The project involved two buildings, with scaffolding required to provide access to the roofs and support the work taking place above.
Scaffolding and Roof Access for Student Accommodation
With students living at the development, careful consideration had to be given to how the scaffolding work would affect those moving around the courtyards below.
The installation also required a combination of access equipment. Telehandlers were used to lift scaffold materials to roof level, while scissor lifts provided additional access during the work.
Working across two separate buildings meant coordinating the movement of materials and equipment, particularly in areas where residents could be nearby.
Safety was, as always, an important consideration throughout.
A wire-based safety system, known as a man-line, was available on the roof, allowing suitable fall-arrest equipment, including inertia reels, to be connected in accordance with the system’s requirements. This provided an additional means of protecting operatives working at height.
It’s something we take seriously at M8 Scaffolding. Working at height carries obvious risks, and however familiar the work becomes, there’s no room for complacency. Everyone should be able to finish their shift and get home safely.
The project was completed well ahead of schedule, with the scaffolding subsequently dismantled and removed from site.
There were a few things to work through as the project progressed, as is often the case when working with a new client, but the end result was a successful installation and a satisfied customer. We’d be pleased to work with them again.